K11 Rigid cementitious waterproof Slurry (double component)

FOB Reference Price:Get Latest Price
US $0.8-1 / Kilogram | 1000 Kilogram/Kilograms (Min. Order)
Supply Ability:
200 Ton/Tons per Day
Port:
Guangzhou, Shenzhen, Nansha
Overview
Quick Details
Type:
Other Waterproofing Materials
Place of Origin:
Guangdong, China (Mainland)
Brand Name:
yunyan
Model Number:
YY-828A
Application:
Outdoor and Indoor wall waterproof
Color:
Grey or blue or green
Usage:
1.5-1.7kg/mm/m2
Construction:
brush or spray
Packaging & Delivery
Packaging Details
25kg/bag powder +9kg/barrel additive or 20kg/set
Delivery Time
Shipped in 7 days after payment

 

 

K11 Rigid cementitious waterproof Slurry (double component)

YY-828A

K11 rigid waterproofing slurry is a double component self curing liquid synthetic polymer that forms a thin, excellent, seamless waterproofing material.

 

1. Has unique penetrating function.

2. The waterproof layer doesn’t need the protective layer.

3. It is environmental product, no-toxic, no smell, non radiation.

4. Cement-based product has anti-aging, good weather resistance function.

5. Construction is simple, brush directly, greatly improves construction efficiency.

6. Has good two-way cohesiveness. Waterproof layer can be directly plastered and pasted.

 

1,Indoor and outdoor plane and elevation of concrete structure, bottom surface cementing, brick wall, light brick and other institutions.

2,Be suitable for basement, parking place, swimming pool, water pool, kitchen, bathroom, and balcony and so on.

3,It can be used for wall repairing, tile fracture, and large-scale renovation waterproof.

 

Base plane must be firm, smooth, and free of dust, oil, release agents, batik materials and so on.

All the small gaps and hole can be filled which is mixed with powder with a small amount of water.

The exterior and internal angle should be round

Leakage phenomena should be disposed firstly, and then start further waterproofing.

Base plane should be pre-wet, and be constructed after no clear water. That the construction could be faster, smoother; construction efficiency could be improved, material costs could be saved.

 

 

Mix 25kg powders with 9 latex for brushing; Firstly put latex into one container, and add slowly powder, and then stir completely, standing for 5 minutes then remix again could get better effect.

Brush using crossways more than 2 directions by roller or brush; depending on the standards of waterproof, base material and so on. The second time of construction should be done after 2 hours of the first one, it is the best time when the first layer not completely dry, or non-stick hand.

If it takes too long to dry the first layer, the construction should start after wetting the base plane and without clear water.

Keep stirring intermittently to prevent precipitation.

Within 24 hours of completion of the construction, should to prevent human trampling. When it is hot and dry, increase water curing in order to improve cohesion strength and waterproof effects.

 

Well-mixed sizing agent should be used within 2 hours, if it comes dry don’t add water and reuse.

Construction should be done from 5 to 40℃, cannot be done under 0 ℃or rain.

Provide ventilation installation when construct in poorly ventilated or enclosed environment.

The construction should start after the base plane is wet and without clear water, which can greatly improve waterproof effect; if it takes long time between 2 times constructions that should start after wet.

 

Keep in cold and dry place, unopened powder is valid for 1 year, additives is valid for 12 months.

 

Packing

25kg powder+9kg liquid

20kg/set

 

  

3d compressive strength (MPa)

≥13

3d anti-breaking strength (MPa)

≥3

7d impermeability (MPa)

≥1.5

7d cohesive strength (MPa)

≥1.4

Usage  kg/m²/mm

1.5-1.8

 

    

 

 

 

FOR OEM:

1. Brand Owners Authorization Letter is required to be issued & provided for the corresponding production and exportation;

2. Quality only based on the samples which the buyer provided or YUNYANs counter-sample confirmed by buyer.

In every case, the user alone is fully responsible for any consequences deriving from the use of the product.

3. OEM MOQ: at least 1*20 feet container per item/color.

 

  FOR DELIVERY:

Minimum Order Quantity:

100sets

Price:

negotiation

Packaging Details:

Composite paper bag w/. Plastic bag inside

Delivery Time:

5-7days

Payment Terms:

Ex works

Supply Ability:

100, 000sets/week